The tallest building in the European Union stands in Warsaw
Show on mapVarso Tower is 310 meters tall including its spire. Since 2021 it has been the tallest building in the EU.

Without its spire, Varso Tower would not hold the record. The roof of the Warsaw skyscraper is 230 meters up, lower than the roof of Frankfurt's Commerzbank Tower (259 m). It is the 80-meter openwork spire that lifts the building to 310 meters and makes it the tallest building in the European Union.
That spire counts because the international body that keeps the world's skyscraper rankings says it does. The antenna on top of the Commerzbank Tower, which reaches 300 meters, does not. The difference between a spire and an antenna decides which country has the EU's tallest building.
Varso stands in central Warsaw on the corner of Chmielna Street and John Paul II Avenue, right next to Central Station. It was designed by the British firm Foster + Partners for the Slovak developer HB Reavis. The last piece of the spire went up in February 2021, construction finished in September 2022, and in September 2025 the highest observation deck in the EU opened on the 53rd floor.
How tall is Varso Tower?
Varso Tower is 310 meters tall. That is 230 meters of building, up to the highest occupied floor, plus an 80-meter openwork spire weighing 53 tonnes. The tower has 53 floors above ground and 4 below.
Varso is part of a complex of three buildings. The two lower ones, Varso 1 and Varso 2, are 81 and 90 meters tall and were designed by the Warsaw firm HRA Architekci. Together the complex has about 140,000 m² of floor space, above a four-level underground garage for about 1,100 cars and 750 bikes.
The record is won by a whisker. London's The Shard is 309.6 meters tall, so Varso beats it by 40 cm. When the Warsaw tower was designed, Britain was still in the EU and The Shard was the bloc's tallest building. Since Brexit at the start of 2020, that comparison only matters at the European level.
How is a skyscraper measured? Spires vs. antennas
The world's tallest-building rankings are kept by the Council on Tall Buildings and Urban Habitat (CTBUH), a Chicago-based nonprofit that has operated as the Council on Vertical Urbanism since 2025. Its main yardstick is height to architectural top: from the lowest significant pedestrian entrance to the top of the building, including spires but excluding antennas, flagpoles, signage and other technical equipment.
That is the whole story. Varso's spire is part of the architecture, designed together with the building, so it counts. The Commerzbank Tower in Frankfurt is 259 meters to the roof and about 300 meters to the tip of its antenna, but an antenna is equipment, so the ranking uses 259 meters. If antennas counted, Frankfurt would trail Warsaw by only 10 meters.
CTBUH also publishes two other measures. By those, Varso is 310 meters to its highest point and 230 meters to its highest occupied floor. In the CTBUH database, Varso is the sixth-tallest building in Europe. The taller ones are all in Russia, led by the Lakhta Center in St. Petersburg.
- height to architectural top (used for rankings): spires in, antennas out; Varso: 310 m
- height to tip: everything included, antennas and masts too; Varso: 310 m
- occupied height: to the highest occupied floor; Varso: 230 m
How was the EU's tallest building built?
In 2011 HB Reavis bought a 1.72-hectare plot next to Central Station from the Polish state railways (PKP) for about 171 million złoty. The project was first called Chmielna Business Center and was planned as a 130-meter tower. The plans grew, and the name changed to Varso, from Varsovia, the Latin name for Warsaw. In 2017 the cost was estimated at about 500 million euros.
The building permit came in December 2016, and work began that same month. First, a transformer that powered Central Station had to be moved, because it stood exactly where the tower would go. In October 2017, at a depth of about 10 meters, excavators hit a 60-tonne glacial boulder dropped there by an ice sheet. It was lifted out by crane and moved to Mokotów Field, a park in the south of the city center.
In January 2021 Varso overtook the Palace of Culture and Science, Poland's tallest building since 1955. Assembly of the spire began the same month. Its final section was lifted into place on February 20, 2021, and the building reached 310 meters. Because of strong winds, the spire was anchored several meters down into the structure. Construction was completed in September 2022.
What holds the tower up beside the railway tracks?
Below the four basement levels sits a reinforced concrete slab between 1.5 and 3.6 meters thick. Engineers visiting the site in 2018 saw 28 layers of steel reinforcement at its thickest point. Beneath it are rectangular concrete piles called barrettes. Each measures 0.8 by 5.6 meters across and extends 17.5 meters into the ground below the slab. The slab and piles work together to carry the weight of the tower and limit how far it settles.
Space was just as tight underground as it was at street level. The engineers had to fit the piles around old railway foundations. A sewer pipe serving the railway station’s relocated pumps had to pass between the basement wall and the retaining wall beside the tracks. Workers dug a timber-lined tunnel about 35 meters long for that pipe. The tower basement also houses the intake that draws fresh air into the railway station next door.
Varso Tower's observation deck: 230 meters above Warsaw
Highline Warsaw, the public observation deck on the 53rd floor, opened on September 9, 2025. It is 230 meters up, with a full 360-degree view around the tower. It is the highest publicly accessible deck in the European Union, roughly twice as high as the 30th-floor terrace of the Palace of Culture and Science, which is 114 meters up.
You ride up in a glass elevator. The 49th floor holds HighGarden, a bar with a garden terrace, and the 46th has a room showing multimedia films about the history of Warsaw. Ticket prices depend on the day and time; sunset slots are the most popular, and tickets bought online are usually cheaper than at the door.

Varso, the Palace of Culture and Wieliczka: records on one scale
The Palace of Culture and Science, a gift from Stalin completed in 1955, is 237 meters tall with its spire and stands a few hundred meters from Varso. It was Poland's tallest building for more than 60 years. The Varso observation deck is 116 meters higher than the one at the Palace.
The most striking comparison, though, is underground. The Wieliczka Salt Mine near Kraków has 9 levels and reaches 327 meters deep. Stand Varso Tower on the floor of its deepest working and the tip of the spire would not reach the surface. Tourists in Wieliczka go down to 135 meters, which is still farther than the Palace of Culture terrace is high.

How do you plant full-grown trees inside a skyscraper?
The twelve trees in the Varso lobby were growing for the building in a Dutch arboretum from 2019, well before the tower was finished. The landscape designers chose a tropical tree commonly called the black olive. From the lobby floor you can look up through its small leaves and see the branches silhouetted against the tall windows, a detail easy to miss in photographs of the facade.
The journey to Warsaw took place in temperature-controlled vehicles. On site the planting crew used specially heated tunnels to keep cold air away from the trees. Each root ball went into a concrete planter 1.5 meters deep. You can see this indoor grove from the entrances on Chmielna Street and Jana Pawła II Avenue. The sixteen trees on a terrace more than 200 meters above are a separate planting.
How can one elevator serve two floors at a single stop?
Some of Varso’s office elevators have two passenger cars mounted one above the other. When the lower car opens on one floor, the upper car serves the floor above. Two sets of passengers can travel in the same shaft on the same trip. Schindler, the manufacturer, counts twelve double-deck elevators among the 57 it installed across Varso Place, including the two shorter buildings.
During construction, a different lift rose with the tower. It ran inside the building and could be extended as floors were added. It carried workers and loads of up to two metric tons, freeing the facade from the need for an external construction hoist. The glass elevators that carry visitors to the observation terraces are separate again.
The tower by numbers: elevators, radio and a garden
Varso is first of all an office tower, with about 70,000 m² of offices. It has a reinforced concrete structure and earned Outstanding, the top rating of the BREEAM green building certificate. The lobby is 14 meters high, and the plaza outside connects to the neighboring buildings and the station concourse.
The tower also works as a radio mast. Test broadcasts went out from Varso in 2023, and in 2025 Polish Radio and several commercial stations began broadcasting from it officially. High up on the building is a terrace with 16 trees, billed as the highest garden in the city.
- 17 elevators, the fastest running at 8 m/s
- 53 floors above ground, 4 below
- parking for about 1,100 cars, 80 motorcycles and 750 bikes
- glacial boulder from the dig: 60 tonnes, found 10 m down
Timeline
- 2011HB Reavis buys the plot next to Central Station from the state railways.
- Dec 2016Building permit issued; work begins.
- Oct 2017A 60-tonne glacial boulder is found in the excavation.
- Jan 2021Varso grows taller than the Palace of Culture and Science.
- Feb 20, 2021The last section of the spire is in place: the building is 310 m tall.
- Sep 2022Construction of the EU's tallest building is completed.
- 2023First test radio broadcasts from Varso.
- Sep 9, 2025The Highline Warsaw observation deck opens at 230 m.
Practical info
- Where
- Warsaw, 69 Chmielna Street, next to Warszawa Centralna station.
- Best time
- A clear day, when you can see well beyond the city. Sunset time slots sell out fastest.
- Getting there
- Train to Warszawa Centralna; the Varso complex connects to the station's underground concourse.
- Tickets
- Timed entry; prices vary by day and time and are usually lower online. Check current prices on the Highline Warsaw website.
- On site
- The deck on the 53rd floor, the HighGarden bar on the 49th, a room with films about Warsaw's history. No pets.
Questions and answers
How tall is Varso Tower?
Varso Tower is 310 meters (1,017 ft) tall including its 80-meter spire. Its highest occupied floor is at 230 meters.
How many floors does Varso Tower have?
The tower has 53 floors above ground and 4 below. The observation deck is on the 53rd floor.
Is Varso Tower the tallest building in Europe?
No, but it is the tallest in the European Union. In the CTBUH database it ranks sixth in Europe; the taller buildings are in Russia.
Why does Varso's spire count toward its height when an antenna doesn't?
Under CTBUH rules a spire is part of the architecture, while an antenna is technical equipment. That is why Varso is ranked at 310 m and the Commerzbank Tower at 259 m, even though its antenna reaches 300 m.
Who designed Varso Tower?
The main tower was designed by the British firm Foster + Partners and the two lower buildings by the Warsaw firm HRA Architekci. The developer was HB Reavis.
How high is the Varso Tower observation deck?
The Highline Warsaw deck is on the 53rd floor, 230 meters up. That is about twice as high as the Palace of Culture and Science terrace (114 m).
Sources
- Wikipedia: Varso Tower (in Polish) (opens in a new tab)
- Wikipedia: Palace of Culture and Science (in Polish) (opens in a new tab)
- CTBUH Skyscraper Center: Varso Tower (opens in a new tab)
- Commerzbank: Commerzbank Tower facts and figures (opens in a new tab)
- Varso Place: bringing the lobby trees to Warsaw (opens in a new tab)
- Schindler: double-deck, construction and panoramic elevators at Varso Place (opens in a new tab)
- Highline Warsaw: observation deck (opens in a new tab)
- Buro Happold in Builder: the structure and foundations of Varso Tower (in Polish) (opens in a new tab)
- Mazovian Chamber of Civil Engineers: inspecting the foundation reinforcement (in Polish) (opens in a new tab)
- Notes from Poland: Varso becomes the EU's tallest building (2021) (opens in a new tab)
- Notes from Poland: highest observation deck in the EU opens (2025) (opens in a new tab)
- Dezeen: Foster + Partners completes Varso Tower (opens in a new tab)
- Palace of Culture and Science: viewing terrace (opens in a new tab)
- Wieliczka Salt Mine: press information (in Polish) (opens in a new tab)
- Elevator World: CTBUH renamed Council on Vertical Urbanism (opens in a new tab)
- Wikipedia: Varso (opens in a new tab)
- Wikipedia: List of tallest buildings in Europe (opens in a new tab)